top of page
007 COMMERCIAL-Model.jpg

N7 STATION

Master

Tehran Urban Railway Operation CO

Location

Tehran, Iran

Year

2015

Activity

Head architectural department and Designer

Software

Autocad

​N7 subway station is a station with a commercial floor.

018 SECTION J-Model.jpg
LAYOUT  09-A1E 20.jpg
20141215_IMG_2830.JPG
detail-90-9-22-Model.jpg

This station is the longest station in Tehran and the only station has three floors underground that in the first floor uses commercial and has many stores. It is the turning point in Line 7, before and after it, the line way changed, so I faced a lot of problems that I solved them, as well as, I was head of the architectural department, so I communicated with contractors to incorporate input into project designs, created new and innovative approaches to solve problems and discussed strategies, reviewed and checked technical drawings by architectural technicians, CAD technicians, and drafters, verified construction documentation conformed to quality assurance standards and client requirements, coordinated with segment leaders to promote architectural goals and design concepts.

023 SECTION O-Model.jpg

Previous 

Next

bottom of page